Supervisory and workshop supervision of the pumping station of the Hesseh and Dark wastewater treatment plant



Client: Isfahan Province Water and Wastewater Company
Contract start date: 2014-02-22
Brief description:
According to the above contract, the engineering services including the high-level and workshop supervision of the construction of the Hesseh and Dark sewage pumping station located in the North Isfahan treatment plant have been assigned to this consultant.
In this project, a sewage pumping station was designed and implemented to transport sewage at the North Isfahan treatment plant, which has been moved to a depth of 12 meters. In this project, a mechanical garbage collector was designed and implemented at a height of 17 meters. This garbage collector was implemented and started operating at this height for the first time in the Middle East. The outlet of this pumping station leads to the North Isfahan treatment plant.
Project Technical Specifications:
- Population at the end of the project period
Nominal capacity: 3600 cubic meters per hour - Number of pumps (main + reserve): 4 + 2
- Pumping height: 25 meters
- Diameter and material of the inlet pipe to the pump: 1200 mm concrete
- Diameter and material of the outlet pipe: 400 and 500 mm steel
- Height of the mechanical garbage collector: 17 meters
- Outlet wastewater disposal site: North Isfahan Treatment Plant