Saveh Industrial Park Wastewater Treatment Plant Project

Client: Markazi Province Industrial Estates Company
Contract start date: 2021-07-11
Brief description:
According to the above contract, technical services and studies related to the study of the Saveh Industrial Town Wastewater Treatment Plant design have been assigned to this consultant.
The purpose of the study is to design the Saveh Industrial Town Wastewater Treatment Plant based on the latest design criteria, environmental standards, and state-of-the-art technology.
In the design option, the main mechanism for wastewater treatment is the use of biological agents under anaerobic and aerobic conditions. The high levels of pollutants in industrial wastewater make it impossible to achieve sufficient efficiency for pollutant removal from a single system.
In the Saveh Industrial Town Wastewater Treatment Plant design, raw wastewater enters the anaerobic unit after passing through the debris, granulation, and balancing units, and then the effluent is transferred to the aeration, final sedimentation, and disinfection units.
Project Technical Specifications:
Projected flow rate: 5000 cubic meters per day
Area covered: Saveh Industrial Park
Number of modules: 5 parallel modules
Treatment system: EAAS+ UABR
Effluent discharge standard: Discharge for agricultural use