Employer: Agricultural Jihad Organization of Lorestan Province

Contract start date: 2009-03-18

Brief description:

The equipment and renovation plan is related to the lands of the village of Kapar Jodaki with a gross area of ​​216 hectares, which has been designed for leveling operations and implementing open drainage and irrigation networks (concrete canals).

The general objectives of this plan are as follows:

1. Geometric arrangement and arrangement of irregular agricultural plots, standardizing them, and optimal distribution of water among agricultural plots.

2. Collection, guidance, and discharge of excess irrigation and rainfall water in agricultural units through the construction of main and secondary open drainage. (3000 meters of main open drainage and 1600 meters of secondary open drainage were constructed).

3. Construction of access and communication roads between agricultural plots to carry out agricultural mechanization operations.

4. Construction of an irrigation network in the form of concrete canals with a length of 6158 meters.

5. Increase irrigation efficiency as a result of canalization of irrigation rivers.

6. Construction of a pumping station and transfer of existing drainage water at the end of the drains to the river.

As a result of the implementation of this project, irrigation efficiency increased and losses due to irrigation were prevented. Leveling of uneven lands and, as a result, more land under cultivation, uniformity of agricultural crop growth, as well as increasing yield and yield per unit area are among the results of the project. Ultimately, all of the above goals are to achieve optimal use of water and soil resources and achieve higher yield efficiency by using mechanized planting, harvesting and harvesting operations.

Software development methods used:

LEVEL: To control the provided leveling sheets and correct them.

TADBIR: To estimate the riyals of the operations performed and correct the statements sent by the contractor.

Auto Desk Land Developer: To draw and control the project line of the canal route.

FlowPro: For hydraulic calculations of the canals.