Supplementary studies on water supply in the Damchenar Sarchenar area and studies on the second phase of the Saqavah Dam

saghaveh
saghaveh

Client: Kohgiluyeh and Boyer-Ahmad Province Regional Water Company

Contract start date: 2020-11-18

Brief description:

The construction site of the Saqavah Reservoir Dam is located in Kohgiluyeh and Boyer Ahmad Province, about 70 kilometers northwest of Yasuj County.

The purpose of the construction of the Saqavah Reservoir Dam is to store and transfer water and control surface flows in order to provide industrial and agricultural water to the Saqavah region, as well as to control floods.

Project Technical Specifications:

Dam type: Gravel with clay core
Dam crest elevation: 2168 meters above sea level
Height from riverbed: 42 meters
Dam height from foundation: 47 meters
Reservoir volume: 9.5 m³
Body embankment volume: 1.6 m³
Normal elevation: 2163 m³

Diversion system: 3x2 meter culvert, 220 meters long, with a culvert

  • Spillway type: 9 meter wide, 190 meter long