Water and sewage facilities and industrial and sanitary waste of Mobarakeh Steel
Client: Mobarakeh Steel Company of Isfahan
Contract start date: 2012-08-15
Brief description:
According to the above contract, technical services and studies related to the optimization of the existing wastewater treatment plant and consulting on the development of the wastewater treatment plant of the Mobarakeh Steel Complex have been assigned to this consultant in the form of 5 work orders.
The subject of the contract is the use of consulting engineering services in the field of studies and preparation of plans related to the first and second stages of water and sewage facilities and industrial and sanitary waste projects in the Mobarakeh Steel Company and the Saba area, which, given the nature of the work in each case, was referred to the consulting engineer by the employer under a contract and under the title of work order.
Project Technical Specifications:
First agenda: Review of study plans for optimizing the existing wastewater treatment plant
Second agenda: Design and perform SYSCEL calculations for the installation of a new crane structure and design of the electrical and control system for the cranes and prepare tender documents
Third agenda: Present a design for a GRP industrial water pipe network to replace the existing network on the pipe racks in the cold rolling area and prepare tender documents
Fourth agenda: Replace the industrial water ring of the pelletizing unit
Fifth agenda: Collect information and carefully study the factors that form and intensify water vapor and perform calculations related to the workshop space, including structural drawings, equipment and workshop barriers, and air inlet and outlet valves, and submit a report