Client: Isfahan Province Regional Water Company
Contract start date: 2017-01-30
Brief description:
According to the above contract, technical services and studies related to the studies of the first and second stages of the water supply and transmission plan for the cities and villages of the cities of Feridan, including 7 cities and 98 villages, have been assigned to this consultant.
The purpose of these studies is to provide safe and hygienic drinking water to the people, considering the increasing pollution of existing water resources and the need for access to safe drinking water in the region.
The supply location of this project is from the Langan spring, which is 107 kilometers of transmission line with diameters of 250 to 700 mm, 3 pumping stations, 10 reservoirs and a maximum daily flow of 420 liters per second. It was decided that 65% of the water would be supplied from the Langan spring and 35% from the wells of the region.
Project Technical Specifications:
- Project horizon population: 154,527 people
- Water requirement: 6.54 million cubic meters
- Maximum daily flow rate: 270 liters per second
- Transmission line length: 107 km
- Pipe diameter: 700, 600, 500, 400, 300, 250, 150 and 100 mm
- Pipe material: steel and polyethylene
- Number of pumping stations: 3 stations
- Volume and number of tanks: about 10,000 cubic meters and 10 heads