The Road and Bridge Studies Department of Sepahan Comprehensive Consulting Engineers has succeeded in obtaining a road construction specialty in the years it has been providing road and bridge construction services, considering its design, implementation, and expert workforce.

This consulting engineering firm is ready to provide services in the following fields:

In the process of providing services, this department generally conducts preliminary studies, the first and second stages, and supervises the implementation of rural and main roads, highways, freeways, bridges and tunnels, related technical buildings and their improvement, and provides technical and consulting services in the field of road management and machinery maintenance, studies of traffic accident points and road improvement, and studies and supervises urban and intercity intersections. The following are the specific services provided by this department:

1. Study and design of preliminary stages, the first and second stages of all types of roads, including intercity freeways, highways, main, secondary, rural roads, etc.

2. Study and design of preliminary stages, the first and second stages of the improvement plan for roads in operation (freeways, highways, main roads, secondary roads, etc.)

3. Design of all types of at-grade and non-at-grade intersections

4. Plans for organizing, preparing and designing urban road network including existing cities and new cities and towns, industrial towns, etc.

5. Studying and designing the stages of identification, first and second stages of geometric designs and placement of various types of bridges, tunnels and special structures in road construction plans

6. Designing and locating various types of roadside service centers, road maintenance, etc. in accordance with technical requirements

7. Designing road safety signs and specifications, including various types of markings, signage, traffic and warning lights, etc.

8. Conducting traffic studies and determining the traffic load of routes under construction.

9. Designing various types of new pavements, including flexible and rigid pavements (asphalt concrete pavement, jointed concrete, roller concrete, polymer, etc.)

10. Designing and organizing various soil stabilization methods.

11. Design of various technical structures: embankments (underground and surface embankments), retaining and return walls, culverts, etc.

12. Plans for organizing and transferring internal and external surface water in new cities and towns.

13. Conducting various economic, social, environmental, passive defense, etc. analyses of projects under study in the field of roads and bridges

Click to view the featured projects in this section

Summary of the consultant's background in road and bridge affairs

Edit Content
Project titleContract dateEmployer
Completion of studies on the Semirom-Henna axis2026-03General Directorate of Roads and Urban Development of Isfahan Province
Studies on the Hosseinabad-Badrood axis2026-02General Directorate of Roads and Urban Development of Isfahan Province
Badrud-Natanz axis studies2026-02General Directorate of Roads and Urban Development of Isfahan Province
Golpayegan Beltway Studies2026-02General Directorate of Roads and Urban Development of Isfahan Province
Studies on the construction of an alternative bridge between the cities of Dizice and Mobarakeh (Vinich)2025-11General Directorate of Highways and Road Transportation of Isfahan Province
Studies of the Noushabad connection axis to the Aran and Bidgol beltway2025-05General Directorate of Roads and Urban Development of Isfahan Province
Design and studies of the first and second stages of Farvardin 12 intersection in Sanandaj2025-03Sanandaj Municipality
Surveying and designing the first and second stages of Shahid Chamran non-level intersection in Ahvaz2025-02Ahvaz Municipality
Studies of the first and second phases of the underpass intersection of Haftom Tir Boulevard - connecting Fajr Town to Haftom Tir Street in Saveh2024-11Saveh Municipality
Studies of large bridges located on the second lane of the Khairabad-Dehdasht highway2024-07National Transportation Infrastructure Construction and Development Company
Completion of Type 4 (D-B) improvement studies of the 17-kilometer Marivan-Bashmaq route and conducting studies of the first and second stages of the Barda-Rasheh non-level intersection and roundabouts on the route.2024-03General Directorate of Roads and Urban Development of Kurdistan Province
Studies of the first and second stages of the Semirom-Henna-Semirom Eastern Beltway2024-03General Directorate of Roads and Urban Development of Isfahan Province
Review of studies and completion of the design of Azadi Square and Saveh Municipality Square2023-03Saveh Municipality
Study, design and supervision of the Najafabad-Falavarjan-Isfahan freeway2022-06Karim Beton Construction Resist Company
Traffic and construction studies and preparation of executive maps of the entrance to the boundary between Mardparti Square and Balutak Sheikhan Bridge2022-05Izeh Municipality
Review of Phase 1 and Phase 2 studies of a section of the Western Highway Corridor in the Urmia area2022-04General Directorate of Roads and Urban Development of West Azerbaijan Province
Improvement studies type 4 (D-B) of Marivan-Bashmaq route2021-11General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Preliminary studies and obtaining the Article 23 Commission Environmental Studies and Passive Defense for the Construction and Improvement of the Brim-Charosta-Dishmuk-Baghmalek Bridge Route2021-11General Directorate of Roads and Urban Development of Kurdistan Province
Studies of the first and second stages of the high retaining walls of the Yasuj-Semirom axis2020-10General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Studies of the first and second stages and mapping of the second lane of the Yasuj-Semirom highway from Patavah to Qara Bridge2020-10General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Studies of the first and second phases of the bridge and tunnel of the second lane of the Yasuj-Semirom axis from Patavah to the Ghareh bridge2020-10General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Studies on the construction of a bridge system on the Yasuj-Sepidan-Shiraz highway2020-05General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Studies of the first and second stages of the improvement of the old Qom-Tehran road axis2020-05General Directorate of Roads and Urban Development of Qom Province
Mapping and study of the first and second stages of the second Mobarakeh-Borojen runway2020-02General Directorate of Roads and Urban Development of Isfahan Province
Studies and design of a vehicular bridge over the Tashnavi River in Bazfat, Kohrang County2019-06General Directorate of Nomadic Affairs of Chaharmahal and Bakhtiari Province
Studies and design of a pedestrian bridge over the Dehdali River in Dinaran, Ardal County2019-06General Directorate of Nomadic Affairs of Chaharmahal and Bakhtiari Province
Consulting services for identifying and analyzing accidents in high-accident areas of the province (Safety Commission)2019-06General Directorate of Roads and Urban Development of Isfahan Province
Feasibility studies (initial justification) for the construction of the Masjed Soleiman-Mollasani shortcut road, the construction of the second lane of Masjed Soleiman between Mollasani and the Naft Sefid three-way intersection.2019-01Khuzestan Road and Urban Development Department
Studies on the construction of the Lali-Indika axis salt bridge2018-10Khuzestan Road and Urban Development Department
Providing project planning and control services2018-08General Directorate of Road Administration and Road Transport of Chaharmahal and Bakhtiari Province
First and second phase studies and mapping of the Abyaneh-e-Qahrud axis2018-05General Directorate of Roads and Urban Development of Isfahan Province
Providing surveying and design services for pre-phase 2 and phase 2 civil and surface water phases 1 and 2 of the Falavarjan Bridge widening structure2018-04General Directorate of Highways and Road Transportation of Isfahan Province
Study and design (phases one and two) of the new entrance to Falavarjan city on Zob Ahan Freeway2018-04General Directorate of Highways and Road Transportation of Isfahan Province
Studies of the first and second stages and preparation of mapping for the dual-lane construction of a portion of the old Natanz-Kashan road2018-04General Directorate of Roads and Urban Development of Isfahan Province
Studies of the Kohbad non-level intersection on the Izeh beltway2018-03General Directorate of Roads and Urban Development of Khuzestan Province
Preliminary studies and the first phase of the Najafabad - Falavarjan - Isfahan freeway2018-03Karim Beton Construction Resist Company
Type 4 Improvement Studies for Beheshtabad-Ardal T-junction2018-02General Directorate of Roads and Urban Development of Chaharmahal and Bakhtiari Province
Studies of the first and second stages of the ramps and loops of the cable-stayed bridge, Sharafat and Shushtar2018-02General Directorate of Roads and Urban Development of Khuzestan Province
Feasibility studies (initial justification) projects for the construction of a bridge span in the village of Veisi - construction of a second lane and improvement of the existing road from Omidieh to the 1000 gas and LPG factory - Abdul Khan - Bostan - Sableh - Nissan - Hoveyzeh2018-02General Directorate of Roads and Urban Development of Khuzestan Province
Study of 7 km of the secondary road from Imam Sadeq Road to Khorramshahr Road - Studies of the first and second stages of the secondary road between Ahvaz-Khorramshahr Road and Imam Sadeq Road, 7 km long2018-02General Directorate of Roads and Urban Development of Khuzestan Province
Studies on the improvement of the Dishmook-Qaleh Dokhtar axis2018-02Kohgiluyeh and Boyer Ahmad Road and Urban Development Department
Studies of the first and second phases of the Mobarakeh Industrial Park T-junction2017-03Isfahan Province Industrial Towns Company
Design of Phases Zero to Two of the Unlevel Intersection of Azadi Square and Saveh Municipality2017-03Ansar (Jihad Nasr) Participation Group
Preliminary studies of the first and second stages of the East Isfahan Freeway-Isfahan Province Industrial Towns Company
Consulting engineering services including control, surveying and map preparation2016-12General Directorate of Roads and Urban Development of Isfahan Province
Studies of the first and second stages of the Dehq-Meimeh axis-Dehq Municipality
Studies of the second phase of the Shahid Avini-Shahid Beheshti intersection overpass in Saveh city2016-01Saveh Municipality
Preliminary studies of the Abhar-Qaidar and Qaidar-Khorkhoreh axes2015-11General Directorate of Roads and Urban Development of Zanjan Province
Study and design of the Takhti Carriageway Bridge in Ardal County2015-03General Directorate of Nomadic Affairs of Chaharmahal and Bakhtiari Province
Preliminary studies for the improvement of the Zanjan-Qareh Pashtlu axis2015-02General Directorate of Roads and Urban Development of Zanjan Province
Implementation of the bridge management system in Ilam province2015-01Ilam Province Road and Urban Development Department
Studies and management of large bridges in Isfahan province2015-01General Directorate of Roads and Urban Development of Isfahan Province
Studies to prepare a general identification certificate for bridges with a height of 10 meters and above2015-01General Directorate of Roads and Urban Development of Chaharmahal and Bakhtiari Province
Studies on the Landeh-Pataveh-Dehdasht axis2014-12General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Studies of Chamran Overpass Bridge in Ahvaz2014-09Ahvaz Municipality
Studies on the widening of the Eji Bridge and its side roads2014-08General Directorate of Roads and Urban Development of Isfahan Province
Studies of the first and second phases of the CNG entrance intersection design located on Nejatbakh Boulevard and Joi Siah Road between Bahonar Street and Motahari Street and the organization of the intersections of Bahonar Boulevard between the fire station and Aghche Badi neighborhood.2014-08Municipality of Kalishad
Preparing identification documents and component information and recording damage to bridges over 20 meters long (Bridge Management System BMS) located on arterial roads in Isfahan province2014-07General Directorate of Roads and Urban Development of Isfahan Province
Supplementary studies of the first and second stages of the improvement of type (C) rural roads in the counties of Khodabandeh, Abhar, Khormadreh and Ejroud2014-07General Directorate of Roads and Urban Development of Zanjan Province
Studies of the first and second stages of the southern Najafabad ring road2014-06General Directorate of Roads and Urban Development of Isfahan Province
Preparing identification documents and component information and recording damage to bridges less than 10 meters long (Bridge Management System BMS) located on the axes of Isfahan city2014-05General Directorate of Roads and Urban Development of Isfahan Province
Studies of the first and second phases of the Sarrak village road and bridge2014-05General Directorate of Roads and Urban Development of Chaharmahal and Bakhtiari Province
Research studies on the reasons for the reduction in the useful life of asphalt on the roads of Chaharmahal and Bakhtiari province2014-04General Directorate of Roads and Urban Development of Chaharmahal and Bakhtiari Province
Studies of the first and second stages of the improvement of the Naghan road of Karun Dam 4 - Section 22014-02General Directorate of Roads and Urban Development of Chaharmahal and Bakhtiari Province
Part of the first phase studies and second phase studies of the non-level intersection structure of Tohid-Chamran Street, Kianpars, Ahvaz2013-11Ahvaz Improvement and Renovation Organization
Studies of the second phase of the main Sisakht-Kuh Gol road (Ziba Rah)2012-05General Directorate of Roads and Urban Development of Kohgiluyeh and Boyer-Ahmad Province
Supplementary studies of the Zanjan-Airport axis, including studies of the new Zanjan Airport three-way intersection2012-03General Directorate of Roads and Urban Development of Zanjan Province
Studies on the first and second stages of the improvement of the Naghan road of Karun Dam 42012-03General Directorate of Roads and Urban Development of Chaharmahal and Bakhtiari Province
Studies of the first and second stages of the non-level intersection structure of Eqbal Street with the Ahvaz Pasdaran2011-08Ahvaz Improvement and Renovation Organization
Designing the completion and strengthening of the existing bridge decks on Bozorgmehr Street (opposite Navab Safavi Clinic and opposite Al-Karim Mosque) and supervising all implementation and installation operations at the new location (opposite Chamran Hospital and Imam Mohammad Baqer School)2012-01Isfahan District 4 Municipality
Supplementary studies of the Zanjan-Qara-Pashtlu axis, including studies of the first and second stages of the intersection at the beginning of the Zanjan-Qara-Pashtlu axis with the airport route.2010-10General Directorate of Roads and Transportation of Zanjan Province
Supplementary studies of rural roads in the suburbs of Khodabandeh, Abhar, Khorramdareh, and Ejroud counties2010-10General Directorate of Roads and Transportation of Zanjan Province
Studies of the first and second phases of rural roads in Zanjan province2010-08General Directorate of Roads and Transportation of Zanjan Province
Studies of the second stage of the Dashtak Bridge Tabliyeh2010-07General Directorate of Roads and Transportation of Chaharmahal and Bakhtiari Province
Studies on the improvement of rural roads in Gachsaran-Baba Kalan-Bibi Hakimeh2010-06General Directorate of Roads and Transportation of Kohgiluyeh and Boyer-Ahmad Province
Studies of the first and second stages of the Yasuj-Sisakht road2010-06General Directorate of Roads and Transportation of Kohgiluyeh and Boyer-Ahmad Province
Supplementary studies of the first phase of the Rafsanjan-Mes Sarcheshmeh-Khatoonabad axis, the distance between the railway bridge-Khatoonabad-Paghleh-Shahr Babak2010-07Kerman Province Road and Transportation Department
Studies of the second phase of the Asgariyah non-level intersection2010-05Isfahan Municipality
Studies of the second phase of the second Sirjan-Qatruyeh runway2010-02Kerman Province Road and Transportation Department
Studies of the second phase of improvement of type D-B of the Rostamabad-Chabahar axis (the distance between Iranshahr intersection and the end of the conservation area)2010-02Kerman Province Road and Transportation Department
Studies on the improvement of the narrow rural road of Gorab, Boyer-Ahmad County2010-02General Directorate of Roads and Transportation of Kohgiluyeh and Boyer-Ahmad Province
Studies of the non-level intersection of Eqbal Street and Pasdaran Boulevard in Ahvaz2010-02Ahvaz Municipality
Supplementary studies for the second phase of non-level cross-section bridges of Bozorgmehr Street, Hasht Behesht-Noorbaran2010-02Isfahan Municipality
Design of the ventilation, control and fire extinguishing system of Shahid Agha Khani Underpass2010-02Isfahan Municipality
Studies of non-level intersections in Ahvaz city2010-01Ahvaz Municipality
Studies of the first and second stages of the improvement of type D-A of the Rostamabad-Chabahar axis, the distance between the Iranshahr intersection and the end of the conservation area2009-08Kerman Province Road and Transportation Department
Retrofitting studies and design of a new connection between the pedestrian bridge on Bozorgmehr Street in front of Navab Safavi Clinic and the pedestrian bridge in front of Masjid al-Karim, and supervision of its implementation2009-05Isfahan Municipality
Supplementary studies of the Zanjan-Qara Pashtlu axis (studies of the first and second stages of the non-level intersection at the end of the route)2009-01General Directorate of Roads and Transportation of Zanjan Province
Studies of the first and second phases of the Army Military Barracks At-grade Intersection and the new Jalilabad Dosran Variant2009-01General Directorate of Roads and Transportation of Zanjan Province
Supplementary studies of the Zanjan-Qara Pashtlu axis (studies of the first and second stages of the entrance intersection of the Armaghan Khaneh section and the new variant of the Armaghan Khaneh seasonal river)2009-01General Directorate of Roads and Transportation of Zanjan Province
Studies of the first phase of the second Sirjan-Qatrouyeh runway2008-11Kerman Province Road and Transportation Department
Nazhvan Pedestrian Bridge Design (Cable Bridge)2008-11Isfahan Municipality
Studies of the first and second phases of Gorgan city intersections (Vaghi Garage, Zeytoin, Terminal and Sarafraz Hotel roundabouts)2008-08Gorgan Municipality
Studies of the first, second and nailing phases of the Baft County-Kahnouj connection road via Dolatabad2008-07Kerman Province Road and Transportation Department
Studies on the first stage of four-lane Rafsanjan-Sarcheshmeh-Khatunabad axis2008-07Kerman Province Road and Transportation Department
Preliminary studies of the main road Ravar-Shahdad-Bam2008-05Kerman Province Road and Transportation Department
Studies of the first and second stages of the Krebs Bridge2008-05General Directorate of Roads and Transportation of Chaharmahal and Bakhtiari Province
Second phase studies of non-level cross-section bridges on Bozorgmehr Street, Hasht Behesht-Noorbaran2008-04Isfahan Municipality
Amendment to the Hasht Behesht-Bozorgmehr non-level intersection contract2008-03Isfahan Municipality
Mapping and studies of the second phase of the second Ardestan-Zavareh runway2007-12Isfahan Province Road and Transportation Department
First phase studies of rural roads in Bafgh County2007-12Yazd Province Road and Transportation Department
Studies of the first and second stages of upgrading the existing type D-A road to the main road of 60 km length on the Zanjan axis for Poshtlu2007-12General Directorate of Roads and Transportation of Zanjan Province
Second phase studies and second phase mapping of the second runway of Dehaqan-Burojen and Mobarakeh-Burojen Majlesi2007-11Isfahan Province Road and Transportation Department
Studies of the first and second stages of the Sadat-Sarfaryab axis2007-10General Directorate of Roads and Transportation of Kohgiluyeh and Boyer-Ahmad Province
Studies and design of the second phase of the non-level intersection bridges of Bozorgmehr Street - Hasht Behesht2007-08Isfahan Municipality
Edit Content
Project titleContract dateEmployer
Supervision of the reconstruction, repairs and maintenance of electrical, mechanical installations and earthen dam buildings in Isfahan province2026-02Isfahan Province Regional Water Company
Carrying out videometric inspection and monitoring operations of Isfahan's sewage network2025-01Isfahan Province Water and Wastewater Company
Integrated supervision engineering services for the implementation of supplementary operations of the wastewater treatment plant in the villages of Lavasan Bozorg and Rasnan (including supervision before, during and after implementation)2024-10Tehran Province Water and Wastewater Company
Consulting and supervision operations on water, wastewater, treatment plant and building construction projects and providing technical and engineering services in Khuzestan's industrial towns and areas.2024-08Khuzestan Province Industrial Estates Company
High-level and workshop supervision over the implementation of the sewage network in the Khomeini Shahr region2024-04Isfahan Province Water and Wastewater Company
Monitoring the Sureshjan City Wastewater Treatment Plant2024-03Chaharmahal and Bakhtiari Province Water and Wastewater Company
Technical and engineering service support operations and supervision of water, wastewater, treatment plant and building construction projects in towns and industrial areas of Khuzestan2023-05Khuzestan Province Industrial Towns Company
Supervision of projects in villages affiliated to Kurdistan Province - the cities of Qorveh, Bijar and Dehgolan2022-10Kurdistan Province Water and Sewage Company
Supervision of a workshop on the construction of water resources in the cities of Afos and Damane2022-10Isfahan Province Regional Water Company
Supervision of the construction of the 2000 cubic meter Jafariyeh reservoir and the 20000 cubic meter Mehr reservoir in Qom city2022-07Qom Province Water and Wastewater Company
High-level and workshop supervision of the implementation of the Gargab wastewater pumping station2020-01Isfahan Province Water and Wastewater Company
Supervision (senior and workshop supervision) on the implementation of the sewage network in the Khomeini Shahr region2021-12Isfahan Province Water and Wastewater Company
Supervision and workshop on the construction and upgrading of the collection network, sewage transfer and treatment facilities, and wastewater transfer facilities in the Lanjan region2021-02Isfahan Province Water and Wastewater Company
High-level and workshop supervision over the implementation of Shahreza sewage network2020-03Isfahan Province Water and Wastewater Company
Supervision and workshop on the implementation of the sewage network in the cities of Barkhar2020-03Isfahan Province Water and Wastewater Company
Services Monitoring before, during and after the implementation of the collection network and sewage transfer line and treatment plant of the city Sisakht2020-03Kohgiluyeh and Boyer Ahmad Province Water and Sewage Company
Workshop and high-level supervision over the implementation of the emergency sewage transfer line for Mehr Pardisan Qom Housing2020-01Qom Province Water and Wastewater Company
Workshop and senior supervision of the implementation of the sewage network in Pardisan town, Qom province2019-05Qom Province Water and Wastewater Company
Providing high-level supervision and workshop supervision services for the Imanshahr water and sewage network (Minadasht and Ashtarjan neighborhoods)2018-07Isfahan Province Water and Wastewater Company
Providing high-level supervision and workshop supervision services for the Qahdarijan water and wastewater network2018-07Isfahan Province Water and Wastewater Company
Design and workshop supervision of the wastewater transfer project from the East Isfahan Wastewater Treatment Plant to the Persian Marshanan Development Site2018-03Persian Marshanan Development Company
Workshop and high-level supervision of the operation of the first part of the water supply project to the villages of Yeke Bagh and Sanjgan2017-07Qom Province Rural Water and Sewage Company
Providing study services for the third phase of the Ejiye Wastewater Treatment Plant construction project2017-06Isfahan Province Water and Wastewater Company
Providing third-stage engineering services, including senior supervision and on-site supervision, for the construction of a wastewater pumping station in southeast Isfahan.2017-06Isfahan Province Water and Wastewater Company
Providing high-level supervision and workshop supervision services for the Dehno Mobarakeh wastewater pumping station2017-06Isfahan Province Water and Wastewater Company
Third stage engineering services (workshop and advanced supervision) in Sisakht city2017-04Kohgiluyeh and Boyer-Ahmad Province Water and Wastewater Company
Workshop and high-level supervision of water supply from Sarni aqueduct to Qahan village2017-01Qom Province Rural Water and Sewage Company
Workshop and high-level supervision of the project to improve transmission lines and distribution networks in the villages of Jafarabad district of Qom2016-10Qom Province Rural Water and Sewage Company
Workshop supervision of water supply to the Dehno Razak complex in Zarindasht city2016-08Fars Province Rural Water and Sewage Company
Workshop and high-level supervision of the water supply project to the three villages of Qaleh Cham, Chaleh Gonbad and Aliabad Nizar2015-09Qom Province Rural Water and Sewage Company
Third stage engineering services including high-level and workshop supervision of the Heseh and Darak wastewater pumping station2015-06Isfahan Province Water and Wastewater Company
Workshop and high-level supervision of transmission lines and pumping stations of water transmission lines and water supply lines2015-05Qom Province Rural Water and Sewage Company
Workshop supervision on the implementation of Shahreza sewage network2015-01Isfahan Province Water and Wastewater Company
Workshop supervision on the implementation of the Khomeini Shahr sewage network2015-01Isfahan Province Water and Wastewater Company
Workshop and high-level supervision of pumping stations of the water transmission line of the Kahak Qom complex2014-06Qom Province Rural Water and Sewage Company
Engineering services, third stage, on-site supervision of the installation of water and sewage branches in Isfahan city2014-04Isfahan Province Water and Wastewater Company
Third phase engineering services, supervision of the implementation of the sewerage network in Darcheh Khomeini Shahr city2014-04Isfahan Province Water and Wastewater Company
Third stage engineering services including high-level and on-site supervision of the Heseh and Darak wastewater pumping station2014-03Isfahan Province Water and Wastewater Company
Continuing on-site and high-level supervision of the completion of the 2,000 cubic meter water tank for the green space of the Zarrinshahr Municipality2012-08Zarrinshahr Municipality
Engineering services, third stage, workshop supervision on the installation of water and sewage branches in Isfahan city2013-03Isfahan Province Water and Wastewater Company
Workshop and senior supervision of rural water supply projects in the cities of Najafabad, Golpayegan and Khansar2012-07Isfahan Province Rural Water and Sewage Company
Workshop and high-level supervision of the water transfer project to the city of Tafresh and the villages along the route from the Haftian spring2012-01Markazi Province Regional Water Company
Workshop supervision of the Hosseinabad, Khorramabad and Karradeh projects in Jahrom County2012-01Fars Province Rural Water and Sewage Company
Workshop supervision of the implementation of sewage piping projects in the cities of Semirom, Shahreza, Mobarakeh and Khomeinishahr2010-06Isfahan Province Water and Wastewater Company
Workshop supervision on the installation of water and sewage branches in the five regions of Isfahan city2010-04Isfahan Province Water and Wastewater Company
Third stage studies (supervisory and on-site supervision) of rural wastewater projects in the provinces and the village of Tiab, Minab County2010-01Hormozgan Province Rural Water and Sewage Company
Workshop supervision for the implementation of rural water and wastewater projects in Mazandaran2009-11Mazandaran Province Rural Water and Sewage Company
Workshop and high-level supervision of the Rezaabad project in Eqlid County2009-05Fars Province Rural Water and Sewage Company
Workshop and high-level supervision of the Koraki water supply projects in Shiraz and Khorramabad in Jahrom2008-12Fars Province Rural Water and Sewage Company
Workshop supervision on the installation of water and sewage branches in Isfahan city2007-10Isfahan Province Water and Wastewater Company
Workshop and high-level supervision of Shahyoun-Amirseif Andimeshk water supply complex projects2007-08Khuzestan Province Rural Water and Sewage Company
Workshop and high-level supervision of Abadan and Hasheminejad agricultural water supply projects2007-06Khuzestan Province Rural Water and Sewage Company
Workshop and high-level supervision of Shavoor and Ramhormoz water supply complex projects2007-01Khuzestan Province Rural Water and Sewage Company